Gallery
Total images in all categories: 11,037
Total number of hits on all images: 19,612,030
Total number of hits on all images: 19,612,030
012 Terminated West Turnouts Wires.
Image information
Description
The barrier strips were glued in close proximity where the wires are coming through the foam. The “West Group” of turnouts were connected to each other onetime and never taken apart. This will give the best conductivity between the turnouts through the rail joiners. The power to turnouts was accomplished by short (dark sections on the drawing) track sections with pigtails, connected to all the ends of the turnout assembly. Again with only a onetime connection! The power pigtails are marked with ID labels close to the barrier strip. The west turnout power group pigtails are connected together with jumpers. Where possible I maintained “service” loops.
Date
Wednesday, 19 March 2008
Hits
1530
Downloads
0
Filesize
73.76 KB (800 x 601 px)
Author
Dalman_Ed
File size of the original image
401.86 KB (1416 x 1064 px)
You are not authorised to post comments.